TBN TO LOAD 44.000 MT I.ORE AT PARANA IRON (FLOATING STATION)
PLS NOTE COST TO LOAD 44.000 MT OF I.ORE AT PARANA IRON (FLOATING STATION) , BSS 4 DAYS ALONGSIDE AND CONSIDERING BELOW VESSEL DESCRIPTION: LOA: 228,90 MTRS – BEAM: 32,24 MTRS – M.DEPTH: 20,2 NRT: 26.836 – S.DRAFT: 14,50 MTRS. COST BSS RECALADA/ROSARIO/RECALADA: USD 240.200. FOR ANY FURTHER INFO OR DETAILED PDA PLS CONTACT US.…
