MV TBN TO LOAD 40.000 MT SBM AT ROSARIO + SAN LORENZO PORTS
PLS NOTE COST TO LOAD 40.000 MT OF SBM AT ROSARIO (ARROYO SECO TERMINAL) PLUS SAN LORENZO PORT (ACZ TERMINAL), BSS 2 DAYS ALONGSIDE AT EACH LODADING PORT AND CONSIDERING BELOW VESSEL DESCRIPTION: LOA: 189,90 MTRS – BEAM: 32,26 MTRS – M.DEPTH: 17,9 NRT: 18.418 – S.DRAFT: 12,575 MTRS. COST BSS RECALADA/ROSARIO/SAN LORENZO/RECALADA: USD 264.100.…
