PLS NOTE COST TO LOAD 40.000 MT OF SBM AT ROSARIO (ARROYO SECO TERMINAL) PLUS SAN LORENZO PORT (ACZ TERMINAL), BSS 2 DAYS ALONGSIDE AT EACH LODADING PORT AND CONSIDERING BELOW VESSEL DESCRIPTION:
LOA: 189,90 MTRS – BEAM: 32,26 MTRS – M.DEPTH: 17,9
NRT: 18.418 – S.DRAFT: 12,575 MTRS.
COST BSS RECALADA/ROSARIO/SAN LORENZO/RECALADA: USD 264.100.
FOR ANY FURTHER INFO OR DETAILED PDA PLS CONTACT US.
BRGDS
SEVEN SEAS AGENCIA MARITIMA S.A.
